Project duration: 6 months
Project scope:
Design and approval of bottles across six pack sizes: 200 ml, 250 ml, 300 ml, 500 ml, 1000 ml, and 2000 ml
Manufacturing of 30+ moulds (200+ cavities) for six high-speed linear blow moulders
Coordinated first-mould validation with the machine manufacturer, followed by parallel manufacturing and…
Project duration: 8 months
Project scope:
Technical and aesthetic design of a common carbonated drink bottle, based on customer inputs on product application, pack size, and preform weight
Pilot mould manufacturing and rigorous bottle testing as per international standards
Manufacturing of 80+ moulds across four different rotary blowing machine brands for six…
Project duration: 6 months
Project scope:
Design and approval of five bottle variants:
Product application : carbonated soft drinks and non-carbonated fruit drinks
Manufacturing of 85 moulds across machines with 10, 12, 16, and 22-cavity configurations, deployed across 3 factories in South India
Coordinated first-mould validation for downstream change-part development, followed…
Project duration: 18 months (phased delivery)
Project scope:
Design and development of seven bottle variants across round shape, square shape, and specially designed premium pack sizes
Manufacturing of moulds for high-speed linear blowers in 8, 10, and 12-cavity configurations, totalling 80 cavities
Phased manufacturing and delivery aligned to the customer’s rollout schedule…
Project duration: 6 months (from project initiation to final delivery)
Project scope:
Precise replacement of mould holders based on the customer’s high-speed rotary blower
Manufacturing and validation of a pilot set, followed by scaled production of 14+1 sets in total
Phased delivery in line with the customer’s operational timeline
Project Synopsis
The…
Project duration: 6 months (from project initiation to final delivery)
Project scope:
Precise replacement of mould holders based on the customer’s high-speed rotary blower
Manufacturing and validation of a pilot set, followed by scaled production of 14+1 sets in total
Phased delivery in line with the customer’s operational timeline
Project Synopsis
The…